{"id":165741,"date":"2015-10-30T11:24:32","date_gmt":"2015-10-30T15:24:32","guid":{"rendered":"http:\/\/www.manipur.org\/news\/?guid=81f894df9a4d54675d885618731fa505"},"modified":"2015-10-30T11:24:32","modified_gmt":"2015-10-30T15:24:32","slug":"hectic-repairing-work-of-imp-moreh-underway-to-meet-sangai-festival-deadline","status":"publish","type":"post","link":"http:\/\/www.manipur.org\/news\/2015\/10\/30\/hectic-repairing-work-of-imp-moreh-underway-to-meet-sangai-festival-deadline\/","title":{"rendered":"Hectic repairing work of Imp-Moreh underway to meet Sangai festival deadline"},"content":{"rendered":"<p><a href=\"http:\/\/kanglaonline.com\/wp-content\/uploads\/2015\/10\/ifp-30th-oct.jpg\" data-rel=\"lightbox-0\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-79987\" src=\"http:\/\/kanglaonline.com\/wp-content\/uploads\/2015\/10\/ifp-30th-oct.jpg\" alt=\"ifp 30th oct\" width=\"650\" height=\"433\" \/><\/a><\/p>\n<p>IMPHAL, October 30: Hectic work has begun along the Imphal-Moreh highway to repair the stretches badly affected by the recent incessant rains and landslides before the Manipur Sangai Festival which is slated to begin from November 30.<\/p>\n<p>IFP conducted a follow up inspection today of an earlier inspection conducted on October 21 of the damaged highway portion.<\/p>\n<p>The worst portions of the 109 km long Imphal-Moreh highway are found in two stretches before reaching Tengnoupal.<\/p>\n<p>The State Public Works Department has divided the damaged stretch of the highway into three portions and hectic work to repair the same has already begun since some days back.<\/p>\n<p>At the two worst affected portions where the road has sunk, new road surfaces are being constructed by cutting into the hill slopes using proclain, JCB and bull dozers.<\/p>\n<p>The earth and piled up from cutting the hill slope are being pushed down the gorge using JCB and bull dozer to level the road surface.<\/p>\n<p>Once the earth is cleared by the heavy machineries, vehicles including those of security forces, passenger vehicles and private stranded on both sides are allowed passages.<\/p>\n<p>Workers at the site told IFP that their intention is to complete the repairing work ahead of the Sangai Festival.<\/p>\n<p>However, since a new road surface is being constructed by cutting into the hill slopes, even if the construction work is completed, the blacktopping would not be possible before the festival, they added.<\/p>\n<p>They are however trying to atleast complete the laying of WBM ahead of the festival, the workers continued.<\/p>\n<p>They further commented that if the weather allows and it doesn`\u2122t rain, they will be able to meet the deadline.<\/p>\n\n<p class=\"syndicated-attribution\">Read more \/ Original news source: <a href=\"http:\/\/kanglaonline.com\/2015\/10\/hectic-repairing-work-of-impmoreh-underway-to-meet-sangai-festival-deadline\/\">http:\/\/kanglaonline.com\/2015\/10\/hectic-repairing-work-of-impmoreh-underway-to-meet-sangai-festival-deadline\/<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>IMPHAL, October 30: Hectic work has begun along the Imphal-Moreh highway to repair the stretches badly affected by the recent incessant rains and landslides before the Manipur Sangai Festival which<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,4],"tags":[40,43,330],"class_list":["post-165741","post","type-post","status-publish","format-standard","hentry","category-kanglaonline","category-news","tag-headlines","tag-k-featured","tag-kanglaonline-2"],"_links":{"self":[{"href":"http:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/posts\/165741","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/comments?post=165741"}],"version-history":[{"count":1,"href":"http:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/posts\/165741\/revisions"}],"predecessor-version":[{"id":165744,"href":"http:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/posts\/165741\/revisions\/165744"}],"wp:attachment":[{"href":"http:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/media?parent=165741"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/categories?post=165741"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/tags?post=165741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}