{"id":46558,"date":"2012-11-09T20:33:28","date_gmt":"2012-11-10T01:33:28","guid":{"rendered":"http:\/\/www.manipur.org\/news\/?guid=12669002001863b4ee59565ba3efdaa4"},"modified":"2012-11-09T20:33:28","modified_gmt":"2012-11-10T01:33:28","slug":"dgbr-reviews-bros-work-progress-e-pao-net","status":"publish","type":"post","link":"https:\/\/www.manipur.org\/news\/2012\/11\/09\/dgbr-reviews-bros-work-progress-e-pao-net\/","title":{"rendered":"DGBR reviews BRO&#8217;s work progress &#8211; E-Pao.net"},"content":{"rendered":"<table border=\"0\" cellpadding=\"2\" cellspacing=\"7\" style=\"vertical-align:top;\">\n<tr>\n<td width=\"80\" align=\"center\" valign=\"top\"><font style=\"font-size:85%;font-family:arial,sans-serif\"><\/font><\/td>\n<td valign=\"top\" class=\"j\"><font style=\"font-size:85%;font-family:arial,sans-serif\"><\/p>\n<div style=\"padding-top:0.8em;\"><img alt=\"\" height=\"1\" width=\"1\" \/><\/div>\n<div class=\"lh\"><a href=\"http:\/\/news.google.com\/news\/url?sa=t&amp;fd=R&amp;usg=AFQjCNHkcmkLlkSu9h4QchPuPLwUbq8piA&amp;url=http:\/\/e-pao.net\/ge.asp?heading=15&#038;src=101112\"><b>DGBR reviews BRO&#39;s work progress<\/b><\/a><br \/><font size=\"-1\"><b><font color=\"#6f6f6f\">E-Pao.net<\/font><\/b><\/font><br \/><font size=\"-1\">Elaborating on the inconveniences being faced during the road repairing work in <b>Manipur<\/b>, the DGBR observed that in addition to long rainy season and short working season, the slow progress of work has been further compounded by the large number of <b>&#8230;<\/b><\/font><br \/><font size=\"-1\" class=\"p\"><\/font><br \/><font class=\"p\" size=\"-1\"><a class=\"p\" href=\"http:\/\/news.google.com\/news\/more?ncl=dbNWztinoqIFeiM&amp;ned=us\"><nobr><b>and more&nbsp;&raquo;<\/b><\/nobr><\/a><\/font><\/div>\n<p><\/font><\/td>\n<\/tr>\n<\/table>\n\n<p class=\"syndicated-attribution\">Read more \/ Original news source: <a href=\"http:\/\/news.google.com\/news\/url?sa=t&#038;fd=R&#038;usg=AFQjCNHkcmkLlkSu9h4QchPuPLwUbq8piA&#038;url=http:\/\/e-pao.net\/ge.asp?heading=15&#038;src=101112\">http:\/\/news.google.com\/news\/url?sa=t&amp;fd=R&amp;usg=AFQjCNHkcmkLlkSu9h4QchPuPLwUbq8piA&amp;url=http:\/\/e-pao.net\/ge.asp?heading=15&amp;src=101112<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>DGBR reviews BRO&#039;s work progressE-Pao.netElaborating on the inconveniences being faced during the road repairing work in Manipur, the DGBR observed that in addition to long rainy season and short working season, the slow progress of work has been f&#8230;<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[38,4],"tags":[332],"class_list":["post-46558","post","type-post","status-publish","format-standard","hentry","category-google-news","category-news","tag-google-news-2"],"_links":{"self":[{"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/posts\/46558","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/comments?post=46558"}],"version-history":[{"count":0,"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/posts\/46558\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/media?parent=46558"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/categories?post=46558"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/tags?post=46558"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}