{"id":63285,"date":"2013-07-25T05:30:28","date_gmt":"2013-07-25T09:30:28","guid":{"rendered":"http:\/\/www.manipur.org\/news\/?guid=2cf82827ee57b7481434702bb73e00a0"},"modified":"2013-07-25T05:30:28","modified_gmt":"2013-07-25T09:30:28","slug":"trucks-leaving-imphal-stranded","status":"publish","type":"post","link":"https:\/\/www.manipur.org\/news\/2013\/07\/25\/trucks-leaving-imphal-stranded\/","title":{"rendered":"Trucks leaving Imphal stranded"},"content":{"rendered":"<p>The post <a href=\"http:\/\/kanglaonline.com\/2013\/07\/trucks-leaving-imphal-stranded\/\">Trucks leaving Imphal stranded<\/a> appeared first on <a href=\"http:\/\/kanglaonline.com\">\u00a0KanglaOnline.com<\/a>.<\/p>\n<p>IMPHAL, July 25: Empty trucks leaving Imphal yesterday along the National Highway 37 are stuck at a steep stretch at Nun Dalan due to poor condition of the highway.<\/p>\n<p>The stuck trucks which numbered around 500 had to be individually pushed up by the BRTF using an excavator to pass the highway stretch.<\/p>\n<p>However the rescue work had to be postponed for tomorrow following night fall.<\/p>\n<p>It may be mentioned that following the sinking of a 110 meter road stretch at Phesama, Nagaland along the Imphal-Dimapur highway on July 12, vehicles plying along the highway had stopped their run.<\/p>\n<p>Meanwhile, according to reports, around 140 empty fuel tankers and around 500 other empty goods trucks had left Imphal yesterday along the National Highway-37.<\/p>\n<p>The empty trucks after crossing Barak Bridge had started climbing the steep stretch at Nung Dalan and got stuck.<\/p>\n<p>Many trucks are now left stranded along the said portion of the highway. The truck pushing work will be continued from early morning tomorrow.<\/p>\n<p>After the poor road stretch at Nung Dalan, there is only about 78 Kms left to reach Jiribam.<\/p>\n<p>It may be mentioned here that a landslide recently occurred at Nung Dalan which had completely buried a bridge on the said road. The road restoration\/repairing work are being carried out in full swing but due to the rain there is little progress in the work.<\/p>\n<p>Meanwhile, the empty trucks numbering around 300 which had left Imphal are still stuck at Barak. The trucks will hold the night over there only along with the security escorts.<\/p>\n<p>The post <a href=\"http:\/\/kanglaonline.com\/2013\/07\/trucks-leaving-imphal-stranded\/\">Trucks leaving Imphal stranded<\/a> appeared first on <a href=\"http:\/\/kanglaonline.com\">\u00a0KanglaOnline.com<\/a>.<\/p>\n\n<p class=\"syndicated-attribution\">Read more \/ Original news source: <a href=\"http:\/\/kanglaonline.com\/2013\/07\/trucks-leaving-imphal-stranded\/?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=trucks-leaving-imphal-stranded\">http:\/\/kanglaonline.com\/2013\/07\/trucks-leaving-imphal-stranded\/?utm_source=rss&amp;utm_medium=rss&amp;utm_campaign=trucks-leaving-imphal-stranded<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p><p>The post <a href=\"http:\/\/kanglaonline.com\/2013\/07\/trucks-leaving-imphal-stranded\/\">Trucks leaving Imphal stranded<\/a> appeared first on <a href=\"http:\/\/kanglaonline.com\">\u00a0KanglaOnline.com<\/a>.<\/p>\n<p>IMPHAL, July 25: Empty trucks leaving Imphal yesterday along the National Highway 37 are stuck at a steep stretch at Nun Dalan due to poor condition of the highway. The stuck trucks which numbered around 500 had to be individually &#8230; <a href=\"http:\/\/kanglaonline.com\/2013\/07\/trucks-leaving-imphal-stranded\/\">Continue reading <span>&#8594;<\/span><\/a><\/p>\n<\/p>\n<p>The post <a href=\"http:\/\/kanglaonline.com\/2013\/07\/trucks-leaving-imphal-stranded\/\">Trucks leaving Imphal stranded<\/a> appeared first on <a href=\"http:\/\/kanglaonline.com\">\u00a0KanglaOnline.com<\/a>.<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6,4],"tags":[2582,40,203,330,96,1998,2556],"class_list":["post-63285","post","type-post","status-publish","format-standard","hentry","category-kanglaonline","category-news","tag-brtf","tag-headlines","tag-jiribam","tag-kanglaonline-2","tag-nagaland","tag-national-highway-37","tag-phesama"],"_links":{"self":[{"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/posts\/63285","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/comments?post=63285"}],"version-history":[{"count":0,"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/posts\/63285\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/media?parent=63285"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/categories?post=63285"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.manipur.org\/news\/wp-json\/wp\/v2\/tags?post=63285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}