Empty trucks to move on Sep 7

Following assurance of the BRO to insert wheel guards on Barak Bridge which is being repaired presently, trans porters have changed their earlier decision to stop plying on Imphal Jiribam highway until the steel plates being used on the floor of Barak …

Following assurance of the BRO to insert wheel guards on Barak Bridge which is being repaired presently, trans porters have changed their earlier decision to stop plying on Imphal Jiribam highway until the steel plates being used on the floor of Barak Bridge are repaired by wooden planks Source The Sangai Express

Read more / Original news source: http://e-pao.net/ge.asp?heading=3&src=060915