Bore pile at Heingang in bad shape

Although bore pile constructed on the eastern bank of Imphal river at Heingang Mutum Leikai and Heingang Hirom Leikai was intended to strengthen the river bank, the same work, on the contrary, has turned out to be a cause of weathering the bank Sou…

Although bore pile constructed on the eastern bank of Imphal river at Heingang Mutum Leikai and Heingang Hirom Leikai was intended to strengthen the river bank, the same work, on the contrary, has turned out to be a cause of weathering the bank Source The Sangai Express

Read more / Original news source: http://e-pao.net/ge.asp?heading=11&src=260711