Engineers clarify

Following the breach of Iril River embankment at Kyamgei Muslim Makha Leikai which flooded large stretch of the area, engineers of Public Works Department PWD and the Irrigation and Flood Control Department IFCD have clarified that the unfortunate…

Following the breach of Iril River embankment at Kyamgei Muslim Makha Leikai which flooded large stretch of the area, engineers of Public Works Department PWD and the Irrigation and Flood Control Department IFCD have clarified that the unfortunate flood could not be related to the newly constructed Bailey bridge over the river at Kyamgei Arapti and Haotabi Source The Sangai Express

Read more / Original news source: http://e-pao.net/ge.asp?heading=7&src=250516