350 trucks still stranded along ImphalJiribam highway

Even though sixteen days have elapsed since the Barak bridge broke down till today, more than 300 goods laden trucks are still stranded on either side of the bridge Source The Sangai Express

Even though sixteen days have elapsed since the Barak bridge broke down till today, more than 300 goods laden trucks are still stranded on either side of the bridge Source The Sangai Express

Read more / Original news source: http://e-pao.net/ge.asp?heading=17&src=110815