‘Construction of bridge should be done at site mentioned in order’

THOUBAL| Aug 30

The attempt to shift the site of construction of the Suspension Bridge over Thoubal River which is an important source of connectivity between Wangkhem under Wangkhem assembly constituency and Poiroukhongjin under Andro assembly con…

THOUBAL| Aug 30

The attempt to shift the site of construction of the Suspension Bridge over Thoubal River which is an important source of connectivity between Wangkhem under Wangkhem assembly constituency and Poiroukhongjin under Andro assembly constit……

Read more / Original news source: http://www.ifp.co.in/page/items/60874/construction-of-bridge-should-be-done-at-site-mentioned-in-order